launch-runbook

$npx mdskill add rampstackco/claude-skills/launch-runbook

Plan and execute a structured launch runbook for go-live.

  • Coordinates pre-launch verification, DNS cutover, and rollback procedures.
  • Depends on DNS management, monitoring, and deployment tools.
  • Uses launch scope and triggers like 'go-live' or 'deploy to production'.
  • Delivers a step-by-step runbook for the launch day team.

SKILL.md

.github/skills/launch-runbookView on GitHub ↗
---
name: launch-runbook
description: "Plan and execute a launch runbook covering pre-launch verification, go-live procedures, DNS cutover, post-launch monitoring, and rollback procedures. Use this skill whenever the user is preparing to launch a website or product, planning a DNS cutover, building a go-live checklist, or executing a launch day. Triggers on launch runbook, go-live, launch day, DNS cutover, deploy to production, site launch, product launch, cutover plan, launch checklist, deployment procedure. Also triggers when a launch is approaching and the team needs structured coordination, even if 'runbook' is not explicitly stated."
category: operations
catalog_summary: "Go-live runbook, DNS cutover, deploy day procedures"
display_order: 1
---

# Launch Runbook

Plan and execute the launch of a website, product, or major release. The runbook is the document everyone uses on launch day. Stack-agnostic.

This skill is for the launch event. For pre-launch QA, use `qa-testing`. For post-launch incident handling, use `incident-response`.

---

## When to use

- Launching a new website or major redesign
- Migrating from one platform to another
- Releasing a major product or feature
- Coordinating cross-team launches
- Building a runbook for a recurring deploy

## When NOT to use

- Pre-launch testing (use `qa-testing`)
- Post-launch incident response (use `incident-response`)
- After-launch retrospective (use `after-action-report`)

---

## Required inputs

- The launch scope (what's being launched)
- The launch window (date, time, duration)
- The team (roles, on-call rotation)
- The rollback criteria (when to abort)
- The communication plan (who tells whom what, when)

---

## The framework: 4 phases

A launch has four phases. The runbook covers all four.

### Phase 1: Pre-launch (T-30 days to T-1 hour)

Verify everything is ready before the launch window.

**T-30 days:**
- Final scope locked
- Cross-team commitments confirmed
- Pre-launch QA scheduled
- Comms plan drafted

**T-7 days:**
- Pre-launch QA complete
- All critical and major issues resolved
- Performance baseline measured
- Rollback procedures documented and tested
- DNS TTL lowered (if DNS change is part of launch)

**T-1 day:**
- Final go/no-go meeting
- Roles confirmed
- Communication channels set up
- Backup of current production state

**T-1 hour:**
- Team assembled in shared communication channel
- Tools and access verified
- Final smoke test on staging

### Phase 2: Cutover (T-0)

The actual launch. Sequenced steps with owners and verifications.

**Standard cutover steps:**

1. Announce start to internal team
2. Enable maintenance mode (if applicable)
3. Run final database migrations (if applicable)
4. Deploy code to production
5. Verify deploy completed without errors
6. Run smoke tests on production
7. DNS cutover (if applicable)
8. Verify DNS propagation
9. Disable maintenance mode
10. Run full smoke tests on production
11. Announce launch to internal team
12. Begin monitoring window

Each step has:
- Owner
- Pre-conditions
- Action
- Verification
- Time estimate
- Rollback procedure

### Phase 3: Verification (T+0 to T+24 hours)

Confirm the launch is healthy.

**Within first hour:**
- Critical user flows working (checkout, signup, login)
- No spike in error rates
- Performance within expected ranges
- Analytics tracking firing
- Email and notifications working

**Within first 24 hours:**
- No regression in key business metrics
- No accumulating error patterns
- Core Web Vitals stable
- Search Console showing no critical issues (if SEO-relevant)

### Phase 4: Stabilization (T+24 hours to T+7 days)

Monitor the long tail.

- Track error rates day over day
- Track performance day over day
- Track key business metrics vs baseline
- Address any non-blocking issues identified
- Plan the AAR (after-action report)

---

## Roles and responsibilities

A launch has clear role assignments. Ambiguity here is the most common cause of launch chaos.

| Role | Responsibility |
|---|---|
| Launch lead | Owns the runbook. Calls go/no-go. Calls rollback. |
| Deploy operator | Executes the technical deploy steps. |
| QA lead | Runs verification tests and confirms each milestone. |
| Comms lead | Posts internal updates, manages external messaging. |
| On-call engineer | Available for issues during and after launch. |
| Stakeholder rep | Approves on behalf of business stakeholders. |

For small teams, one person may fill multiple roles. Each role's responsibilities should still be explicit.

---

## Rollback criteria

Define before the launch. Decisions are easier to make pre-emptively than under pressure.

**Automatic rollback triggers:**
- Error rate exceeds X percent of normal
- Critical user flow (defined) is broken
- Database integrity issue
- Security vulnerability discovered post-deploy

**Discretionary rollback triggers:**
- Performance degradation beyond Y percent
- Significant degradation in key business metric
- Customer-facing error patterns

**Decision authority:** The launch lead calls rollback. Pre-define who acts as deputy if launch lead is unavailable.

---

## Communication plan

### Internal channels

- **Primary launch channel:** Real-time chat for the launch team only
- **Status channel:** Broader internal updates
- **War room:** Optional video call for high-stakes launches

### Update cadence during launch

- Every 15 minutes during cutover
- Every hour during verification phase
- Daily during stabilization phase

### External communication

- **Customer-facing announcement:** Pre-drafted, scheduled to publish at confirmed-success milestone
- **Status page:** Updated proactively if any user impact
- **Support team:** Briefed in advance on what's launching, common questions, escalation path

---

## Workflow

1. **Build the runbook 30 days out.** Scope, sequence, roles, rollback criteria, comms plan.
2. **Test the rollback procedure.** Untested rollback is hope, not procedure.
3. **Run a tabletop exercise.** Walk through the runbook with the full team. Find gaps.
4. **Lower DNS TTL** 48 to 72 hours before launch (if DNS change is part of launch).
5. **Day-of:** Run the runbook step by step. Verify each step before moving to next.
6. **Monitor.** First hour, first day, first week. Document anything noteworthy.
7. **Schedule the AAR** within 1 to 2 weeks of launch.

---

## Failure patterns

- **Runbook written by one person, not reviewed.** Single perspective misses scenarios.
- **No tested rollback.** Discovering rollback is broken at the moment you need it.
- **Vague step descriptions.** "Deploy to production" without specifying which tool, which command, which environment.
- **No verification step after each action.** Errors propagate.
- **Communication gaps.** Team doesn't know launch is happening, or doesn't know it succeeded.
- **Launching at end of day Friday.** Or before a holiday. Reduce the time available to respond.
- **Skipping pre-launch QA** to hit a date. The bugs appear on launch day instead.
- **Launch fatigue.** Long launches without breaks lead to errors. Plan rest cycles for multi-day launches.
- **No on-call for first 24 hours.** Someone must be reachable.

---

## Output format

Default output: a markdown runbook at `launch-runbook-[project].md` plus supporting checklists.

Structure:

1. Launch metadata (what, when, who)
2. Roles and responsibilities
3. Pre-launch checklist (T-30, T-7, T-1, T-1hr)
4. Cutover sequence (numbered steps, owners, verifications)
5. Rollback procedure
6. Rollback criteria (automatic and discretionary)
7. Communication plan
8. Verification checklist (first hour, first day)
9. Stabilization plan (first week)
10. Contacts (escalation paths, on-call)

---

## Reference files

- [`references/runbook-template.md`](references/runbook-template.md) - Fillable runbook template with example cutover sequences.

More from rampstackco/claude-skills

SkillDescription
ads-creative-developmentHow to produce ad creative that converts at performance scale. Hook patterns, format selection, video pacing, variation systems, sequential testing methodology, fatigue detection, brand-voice alignment without conversion dilution, and platform-specific creative norms. Triggers on ad creative, ad design, hook patterns, ad video pacing, creative testing, ad variations, creative refresh, creative fatigue, refresh ad creative, video ads for Meta, TikTok creative, LinkedIn ad creative, ad asset library. Also triggers when a team is producing creative at scale, planning a creative test cycle, or auditing why creative is not converting.
ads-performance-analyticsHow to read paid media dashboards without fooling yourself. Attribution models, platform reporting quirks, multi-platform reconciliation, ROAS vs LTV horizon traps, statistical noise in performance metrics, incrementality testing, and the failure modes that produce expensive lessons. Triggers on read paid media dashboard, attribution analysis, ROAS vs LTV, multi-platform reconciliation, ad incrementality, geo holdout, conversion lift study, ghost bidding, paid media reporting, board-deck paid media metrics, blended CAC, MMM, MTA, last-click attribution. Also triggers when a marketer is about to scale, kill, or rebudget a campaign based on platform metrics, or when reconciling platform reports against warehouse revenue.
after-action-reportRun a structured after-action review (postmortem, retrospective) on a launch, incident, or completed project to capture timeline, root cause analysis, contributing factors, and actionable lessons. Use this skill whenever the user wants to run a postmortem, retrospective, AAR, or after-action review on any past event. Triggers on after-action report, AAR, postmortem, retrospective, retro, post-incident review, what went well what didn't, lessons learned, blameless postmortem, root cause analysis, RCA, five whys. Also triggers when the user has just shipped something or just resolved an incident and wants to capture learnings.
ai-content-collaborationHow humans and AI compose in content workflows. Where AI legitimately participates, where humans must own, hybrid workflow patterns, voice ownership preservation, the AI slop problem, disclosure and transparency, team calibration, and the ethics of intellectually honest AI-assisted content production. Triggers on AI content workflow, AI-assisted writing, hybrid content production, AI in editorial, AI slop, AI disclosure, AI usage policy, AI content ethics, voice preservation with AI, team AI calibration. Also triggers when content feels generic despite quality tools, when team AI usage has drifted into inconsistency, or when a regulated or trust-sensitive context requires explicit AI policy.
analytics-strategyDesign measurement frameworks including event taxonomy, KPI hierarchy, dashboard architecture, attribution models, and analytics implementation strategy. Use this skill whenever the user wants to plan analytics, design dashboards, build event taxonomies, define KPIs, set up tracking, or audit existing measurement. Triggers on analytics strategy, measurement plan, event taxonomy, tracking plan, KPI framework, dashboard design, north star metric, attribution model, conversion tracking, GA4 setup, Mixpanel setup, analytics audit. Also triggers when the user has data but no clear way to use it, or wants to make decisions but doesn't know what to track.
art-directionDirect visual and creative work for campaigns, photography, illustration, video, and branded experiences. Use this skill whenever the user wants to brief a photographer, direct illustrators, plan a creative campaign, develop visual concepts, write a creative direction document, or evaluate creative work for fit. Triggers on art direction, photo brief, photography brief, illustration brief, campaign concept, creative concept, visual direction, mood board, look and feel, visual treatment, video direction. Also triggers when the user has approved brand identity but needs to extend it into specific creative deliverables.
backup-and-disaster-recoveryPlan and run backups, set recovery objectives, and run disaster recovery drills. Use this skill when defining RPO/RTO targets, designing backup architecture, deciding what to back up and how often, planning for full-region or platform outages, or running a restoration drill. Triggers on backup, restore, RPO, RTO, disaster recovery, DR, business continuity, what if the database is gone, what if our hosting goes down, recovery drill, ransomware planning. Also triggers when an incident reveals a gap in restoration capability.
beta-program-managementRunning closed and open betas that produce real signal. Beta participant selection, structured feedback collection, beta-to-GA decision criteria, and the difference between soft-launch (no structure, no signal), kitchen-sink (everyone in, no actionable feedback), and structured beta (calibrated cohort, intentional feedback loops, clear graduation criteria). Triggers on beta program, alpha test, beta cohort, beta participant, beta feedback, beta to GA decision, design partner, early access program, closed beta, open beta, RC release. Also triggers when a feature is approaching launch and the team needs structured pre-GA validation, when prior betas produced noise rather than signal, or when the team has soft-launched before but wants more structured feedback this time.
brand-archetype-systemApply pre-composed aesthetic archetype defaults to jumpstart brand design work covering color, typography, layout, voice, and imagery direction. Use this skill whenever the user wants a starting point for brand visual and verbal direction, references a brand they want to design near (for example 'something like Stripe' or 'editorial like Linear'), needs to converge faster from many directions to one, or wants known-good defaults for a specific industry vertical. Triggers on archetype, design archetype, brand archetype, near to (brand), in the style of, similar aesthetic, design starting point, brand template, vertical-typical, industry-typical. Also triggers when the user has a brief and wants to map it to a known aesthetic family rather than design from first principles.
brand-discoveryRun upstream brand discovery covering audience research, competitive landscape, category dynamics, problem space, and positioning territory exploration. Use this skill at the very start of a brand or website project when the user needs to understand who they're for, who they compete with, what the audience actually needs, and where the brand could plausibly stand. Triggers on brand discovery, audience research, market research, competitive scan, category research, customer research, who is this for, who are we, positioning research, intake, kickoff. Also triggers when a creative brief is requested but the upstream inputs (audience, competitors, problem space) are not yet clear.